First Scaff was engaged by Murray Art Museum Albury (MAMA) to design and install a scaffold structure as part of a large-scale art installation within the museum’s upstairs gallery.
The scaffold formed an integral component of the exhibition, supporting both the artist’s creative intent and the curatorial team’s installation requirements.
All works were carried out within the gallery’s controlled environment under tight timeframes to ensure the exhibition launch proceeded as scheduled.











